Notices of Construction

If you're looking for information on a specific project, click on the project link below.

Projects in Construction Phase

Peterborough County and Havelock-Belmont-Methuen have jointly partnered on the road reconstruction project of County Road 48 (George St.) from Victoria St to Quebec St, in Havelock. Construction will begin in May continuing until November 2025.

The scope of the work may include:

  • Replacement of buried infrastructure
  • Replacement of concrete sidewalks
  • Replacement of the asphalt roadway surface

Key Points:

  • Staged road closures will be required
  • Pedestrian access will be maintained
  • Access for emergency vehicles will be open at all times

Businesses will remain open throughout construction. Alternative parking arrangements will be available.

 

Projects in Study Phase

Projects in Planning Stage

The County of Peterborough has initiated an Environmental Assessment (EA) to study alternatives for the reconstruction of Ward Street in the settlement area of Bridgenorth due to the removal of the Bridgenorth bypass proposal from the County of Peterborough’s Transportation Plan. The project is being planned as a Schedule ‘C’ Class EA in accordance with the MCEA. The study area includes Ward Street (CR18) from Champlain Road to the James Gifford Causeway (CR14).

The objective of the project is to enhance traffic capacity and optimize traffic circulation along the Ward Street (CR18) corridor for the short to medium term horizon. The project will also consider active transportation opportunities in the community and provide space within the corridor for implementation of the Township Community Improvement Plans.
You are invited to the second and final planned Public Information Centre Meeting. The meeting will be a drop-in format with no formal presentation and is scheduled for the following date/time:


Tuesday, October 15, 2024
Bridgenorth Community Hall
836 Charles Street, Bridgenorth
5:00 to 6:30 pm

 


There is an opportunity at any time during the EA process for interested persons to provide comments.  Any comments received pertaining to the study will be collected under the Environmental Assessment Act and, with the exception of personal information, will become part of the public record.

For more information, to provide comments, or to be placed on the study’s mailing list, please contact:

Doug Saccoccia, P.Eng
General Manager, Engineering & Construction
County of Peterborough
470 Water Street
Peterborough, ON K9H 3M3
Tel: 705-775-2737, ext.3201
Email: dsaccoccia@ptbocounty.ca

Jason Armstrong
Consultant Project Manager
Engage Engineering Ltd.
171 King St, Suite 120
Peterborough, ON K9J 2R8
Tel: 705-755-0427, ext. 203
Email: jason@engageeng.ca

The Study:

The County of Peterborough (County) together with their Consultant, D.M. Wills Associates Ltd. (Wills), is undertaking a Municipal Class Environmental Assessment (MCEA) to complete intersection enhancements at CR 23 (Buckhorn Road) and CR 22 (Curve Lake Rd/16th Line).

The general location of the Study is shown in the figure below.

 

The Process:

This Study is being conducted in accordance with the requirements of a Schedule ‘B’ of the MCEA, October 2000, as amended in 2023. This Schedule ‘B’ Environmental Assessment requires Public Consultation, Indigenous Community Engagement, Archeological Assessments, and Natural Environment Assessments.

How to Participate:

Residents and interested community members are invited to attend a Public Information Centre (PIC) to review Study materials and discuss the Study process. Members of the project team will be in attendance to answer questions.
Date/Time: Thursday September 19, 2024, 5:00pm to 7:00pm
Location: Wesley United Church, 2068 16th Line, Lakefield, ON (northeast corner of Study intersection)

If you are unable to attend, members of the project team (contact details provided below) are available to answer questions regarding the Study. Materials will be available for viewing through the County’s website.

D.M. Wills Associates Ltd. 
Mark Spiers, C. Tech 
Senior Project Manager 
D. M. Wills Associates Ltd 
mspiers@dmwills.com

 
County of Peterborough
Kyle Darling, C.E.T.
Design Supervisor
County of Peterborough
kdarling@ptbocounty.ca

Contact Us

Contact Peterborough County
470 Water Street
Peterborough, Ontario, K9H 3M3

Monday – Friday
8:30am – 4:30pm

Phone: 705-743-0380/1-800-710-9586
Fax: 705-876-1730
info@ptbocounty.ca

This website uses cookies to enhance usability and provide you with a more personal experience. By using this website, you agree to our use of cookies as explained in our Privacy Policy.