The Corporation of the County of Peterborough has received a complete application for a plan of subdivision in accordance with Section 51 (17) and 51 (19.1) of the Planning Act.  The application has been assigned file number 15T-21001. 

The Corporation of the County of Peterborough has also received a complete application for an Official Plan Amendment (OPA) in accordance with Section 22(6.4) of the Planning Act. The application has been assigned file number 15OP-21006.

And the Corporation of the Township of Selwyn has received a complete application for a Zoning By-law Amendment (ZBLA) in accordance with Section 34(10.4) of the Planning Act. The application has been assigned file number C-15-20.

The County and Township are in receipt of a second submission to address agency and peer review comments.

Public Meeting
A future public meeting will be scheduled on these applications and notification of the public meeting will be provided in accordance with the requirements of the Planning Act.

Location
A key map indicates the location of the lands which are subject to the above stated applications at Part of Lots 26 and 27, Concession 7 in Lakefield. 

Purpose and Effect of the Applications 
The purpose of the subdivision application is was originally for a 940-unit residential plan of subdivision. However, based on technical review, some alterations have been made to the plan and the total number of units has been reduced to 910 residential units. The draft plan also includes a number of blocks intended for various uses including stormwater management, open space, and environmental protection/recreational. There are a total of 10 proposed internal streets. The residential units are in various forms ranging from single detached dwellings (263), townhouses (65) and residential apartments (582).  Neighbourhood commercial uses are proposed on the main level of some of the apartment buildings.  The development is proposed to be phased. The subdivision proposal includes an area of 59.17 hectares (146 acres). 

The site of the proposed subdivision is currently designated ‘Low Density – Residential,’ ‘Recreation Open Space,’ ‘Environmental Constraint Area,’ and ‘Environmental Constraint Area – Site Specific Policy Area’. The Official Plan Amendment proposes to re-designate a majority of the subject lands to ‘Medium Density – Residential’. The amendment is proposing a realignment of the ‘Environmental Constraint Area – Site Specific Policy Area.’ In addition, the official plan amendment is seeking to modify the density of development and permit neighbourhood commercial uses. 

The site of the proposed subdivision is zoned ‘Development (D)’ and ‘Environmental Protection (EP)’. The zoning by-law amendment will re-zone the subject lands to ‘Residential Type 1 (R1)’ and ‘Residential Type 3 (R3)’. The amendment is proposing a realignment of the ‘Environmental Protection (EP)’ zone by re-zoning additional lands ‘Environmental Protection (EP)’. An ‘Open Space (OS)’ zone is being added to recognize pedestrian pathways and stormwater management facilities.

The OPA and ZBLA are intended to re-designate and re-zone the subject lands in order to facilitate the development of the lands by plan of subdivision as described above. 

Supporting Studies/Materials
In support of the applications, the following documents and studies were submitted:

Peer review of the supporting documents will be coordinated through the County and Township offices.  A public meeting as required under the Planning Act will be scheduled following the completion of the peer review of the supporting documents.   

Second Submission

Third Submission


The Right to Appeal 
If a person or public body would otherwise have an ability to appeal the decision of the Council of the County of Peterborough in respect of the proposed plan of subdivision or to the Official Plan Amendment, or to the decision of the Council of the Township of Selwyn in respect to the proposed Zoning By-law Amendment to the Ontario Land Tribunal but the person or public body does not make oral submissions at a public meeting or make written submissions to the County of Peterborough or Township of Selwyn before the approval authorities give or refuse to give approval to the plan of subdivision, Official Plan Amendment or Zoning By-law Amendment, the person or public body is not entitled to appeal the decision. 

If a person or public body does not make oral submissions at a public meeting or make written submissions to the County of Peterborough in respect of the proposed plan of subdivision or Official Plan Amendment or to the Township of Selwyn in respect of the Zoning By-law Amendment before the approval authorities make a decision regarding the plan of subdivision, Official Plan Amendment or Zoning By-law Amendment, the person or public body may not be added as a party to the hearing of an appeal before the Ontario Land Tribunal unless, in the opinion of the Tribunal, there are reasonable grounds to do so.

Note: The Planning Act was updated in 2019, whereby only the applicant, Municipality, Minister, public bodies and parties listed under Section 51(48.3) of the Planning Act are entitled to appeal a decision for plans of subdivision or condominium.

To be Notified of the Decision
If you wish to be notified of the decision for any or all of the applications, you must make a written request to the Township of Selwyn or the County of Peterborough at the addresses noted below. 

Contact Information

County of Peterborough
470 Water Street
Peterborough, ON
K9H 3M3

Phone: (705) 743-0380
planning@ptbocounty.ca 

Township of Selwyn
1310 Centre Line
P.O. Box 270
Bridgenorth, ON    
K0L 1H0 

Phone:  705-292-9507 
planning@selwyntownship.ca 

Attachments

Attachment icon for 15T-21001 - Draft Plan of Subdivision 15T-21001 - Draft Plan of Subdivision
Attachment icon for 2nd Submission - Cover Letter Response 2nd Submission - Cover Letter Response
Attachment icon for 2nd Submission - Draft Official Plan Amendment (2023) 2nd Submission - Draft Official Plan Amendment (2023)
Attachment icon for 2nd Submission - Draft Plan of Subdivision 2nd Submission - Draft Plan of Subdivision
Attachment icon for 2nd Submission - Draft Zoning By-Law Amendment 2nd Submission - Draft Zoning By-Law Amendment
Attachment icon for 2nd Submission - Environmental Impact Assessment (amended) 2nd Submission - Environmental Impact Assessment (amended)
Attachment icon for 2nd Submission - Environmental Impact Assessment Response to Comments 2nd Submission - Environmental Impact Assessment Response to Comments
Attachment icon for 2nd Submission - Functional Servicing & SWM Report (2023) 2nd Submission - Functional Servicing & SWM Report (2023)
Attachment icon for 2nd Submission - Functional Servicing & SWM Response to Comments 2nd Submission - Functional Servicing & SWM Response to Comments
Attachment icon for 2nd Submission - Geotechnical Response to Comments 2nd Submission - Geotechnical Response to Comments
Attachment icon for 2nd Submission - Movement and Connectivity Plan 2nd Submission - Movement and Connectivity Plan
Attachment icon for 2nd Submission - Planning Justification Report (2023) 2nd Submission - Planning Justification Report (2023)
Attachment icon for 2nd Submission - Traffic Impact Study Addendum 2nd Submission - Traffic Impact Study Addendum
Attachment icon for 3rd Submission - Comment Response Matrix (2024) 3rd Submission - Comment Response Matrix (2024)
Attachment icon for 3rd Submission - Draft Official Plan Amendment (2024) 3rd Submission - Draft Official Plan Amendment (2024)
Attachment icon for 3rd Submission - Draft Plan of Subdivision (Revised 2024) 3rd Submission - Draft Plan of Subdivision (Revised 2024)
Attachment icon for 3rd Submission - Draft Zoning By-Law Amendment 3rd Submission - Draft Zoning By-Law Amendment
Attachment icon for 3rd Submission - Environmental Impact Assessment (Revised 2024) 3rd Submission - Environmental Impact Assessment (Revised 2024)
Attachment icon for 3rd Submission - Movement & Connectivity Plan 3rd Submission - Movement & Connectivity Plan
Attachment icon for 3rd Submission - Planning Justification Report (Revised 2024) 3rd Submission - Planning Justification Report (Revised 2024)
Attachment icon for 3rd Submission - Tatham Response to Peer Review Comments (2024) 3rd Submission - Tatham Response to Peer Review Comments (2024)
Attachment icon for 3rd Submission - Traffic Impact Study Addendum (2024) 3rd Submission - Traffic Impact Study Addendum (2024)
Attachment icon for 3rd Submission - Wetland Loss & Compensation Figure (2024) 3rd Submission - Wetland Loss & Compensation Figure (2024)
Attachment icon for Environmental Impact Assessment, prepared by GHD Environmental Impact Assessment, prepared by GHD
Attachment icon for Functional Servicing and Stormwater Management Plan, prepared by Tatham Engineering Functional Servicing and Stormwater Management Plan, prepared by Tatham Engineering
Attachment icon for Geotechnical Investigation (2020), prepared by Cambium Geotechnical Investigation (2020), prepared by Cambium
Attachment icon for Geotechnical Investigation (Jan. 2017), prepared by Cambium Geotechnical Investigation (Jan. 2017), prepared by Cambium
Attachment icon for Geotechnical Investigation (March 2017), prepared by Cambium Geotechnical Investigation (March 2017), prepared by Cambium
Attachment icon for Planning Report, prepared by EcoVue Planning Report, prepared by EcoVue
Attachment icon for Traffic Impact Study, prepared by TranPlan Traffic Impact Study, prepared by TranPlan